1956 Bus Project Post Completion
Moderators: warb, Rawdyn, Leroy, byronbus, Tonz Magonz, dmb
- splitthis
- DSKer
- Posts: 1617
- Joined: Wed Nov 28, 2007 8:47 pm
- Location: Adelaide
- Contact:
Re: 1956 Bus Project Post Completion
Thought so, That’s the show I found my split at! I always thought the 23 needed a buff but the lazy prick wouldn’t do it
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Making a few metal repairs
- Attachments
-
- Slide308.GIF (361.98 KiB) Viewed 11532 times
-
- Slide305.GIF (358.65 KiB) Viewed 11532 times
-
- Slide304.GIF (360.73 KiB) Viewed 11532 times
-
- Slide303.GIF (331.9 KiB) Viewed 11532 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
I'm sure this was a lot more work than it needed to be, but its certainly solid once completed. I was living in rural at the time and didn't want to wait for metal parts when I could whip something up myself.
- Attachments
-
- Slide329.GIF (459.06 KiB) Viewed 11532 times
-
- Slide320.GIF (264.37 KiB) Viewed 11532 times
-
- Slide317.GIF (282.12 KiB) Viewed 11532 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Time to deal with this dash/shelf modification that was done somewhere along the line. Found a donor dash at my good old friend Keith Poole's place, cut the replacement panel to suit, clamped it to the hole and then re-cut to suit. A few tacks and welds and the job was done.
- Attachments
-
- Slide416.GIF (363.85 KiB) Viewed 11531 times
-
- Slide415.GIF (408.41 KiB) Viewed 11531 times
-
- Slide414.GIF (388.35 KiB) Viewed 11531 times
-
- Slide413.GIF (235.6 KiB) Viewed 11531 times
-
- Slide412.GIF (422.58 KiB) Viewed 11531 times
-
- Slide411.GIF (355.06 KiB) Viewed 11531 times
-
- Slide409.GIF (365.78 KiB) Viewed 11531 times
-
- Slide408.GIF (364.96 KiB) Viewed 11531 times
-
- Slide407.GIF (348.27 KiB) Viewed 11531 times
Last edited by Kombiiknut on Wed Jan 18, 2023 10:45 am, edited 2 times in total.
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
TIme for old trans/engine mount horns to come out and the new Creative Engineering IRS horns to go in, i have done this a couple of time since deciding to run IRS in my SC, DC, and this bus.
The front trans mount was also cut and modified at the same time but i cant see where i took any photos of that, but really was a simple manufacture of a new mount plate to suit the later bettle nose, dummy mount a gearbox and whack a couple of welds on it to make it all stick.
The front trans mount was also cut and modified at the same time but i cant see where i took any photos of that, but really was a simple manufacture of a new mount plate to suit the later bettle nose, dummy mount a gearbox and whack a couple of welds on it to make it all stick.
- Attachments
-
- Slide404.GIF (221.18 KiB) Viewed 11531 times
-
- Slide403.GIF (283.74 KiB) Viewed 11531 times
-
- Slide402.GIF (274.66 KiB) Viewed 11531 times
-
- Slide401.GIF (237.23 KiB) Viewed 11531 times
-
- Slide400.GIF (446.02 KiB) Viewed 11531 times
-
- Slide399.GIF (484.02 KiB) Viewed 11531 times
-
- Slide398.GIF (419.39 KiB) Viewed 11531 times
-
- Slide397.GIF (450.01 KiB) Viewed 11531 times
-
- Slide394.GIF (477.62 KiB) Viewed 11531 times
-
- Slide393.GIF (461.1 KiB) Viewed 11531 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Another couple of smaller floor repairs, on the next two split projects i just replaced the whole floor, a much better approach, but as this one was going to be covered in sound deadening inside and the floor wasn't in that bad a nic i just patched it up.
Due to that black tar shit, it was hard to get the welder to comply at times, so do go hacking on some of the tacky welds. The process was to burn that shit off with the oxy and then hope for some clean metal to weld to, in the main it wasn't too bad.
Why didnt i just get the thing sandblasted prior to starting? Dickhead or novice? i think both..
Due to that black tar shit, it was hard to get the welder to comply at times, so do go hacking on some of the tacky welds. The process was to burn that shit off with the oxy and then hope for some clean metal to weld to, in the main it wasn't too bad.
Why didnt i just get the thing sandblasted prior to starting? Dickhead or novice? i think both..
- Attachments
-
- Slide369.GIF (423.53 KiB) Viewed 11528 times
-
- Slide359.GIF (411.92 KiB) Viewed 11528 times
-
- Slide356.GIF (381.72 KiB) Viewed 11528 times
-
- Slide354.GIF (369.8 KiB) Viewed 11528 times
-
- Slide347.GIF (333.17 KiB) Viewed 11528 times
-
- Slide346.GIF (431.21 KiB) Viewed 11528 times
-
- Slide344.GIF (387.35 KiB) Viewed 11528 times
-
- Slide342.GIF (413.79 KiB) Viewed 11528 times
-
- Slide341.GIF (398.14 KiB) Viewed 11528 times
-
- Slide340.GIF (392.21 KiB) Viewed 11528 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
A few more pics of the outrigger process
- Attachments
-
- Slide392.GIF (380.22 KiB) Viewed 11526 times
-
- Slide391.GIF (421.39 KiB) Viewed 11526 times
-
- Slide390.GIF (387.64 KiB) Viewed 11526 times
-
- Slide387.GIF (380.83 KiB) Viewed 11526 times
-
- Slide382.GIF (372.07 KiB) Viewed 11526 times
-
- Slide380.GIF (396.45 KiB) Viewed 11526 times
-
- Slide371.GIF (383.35 KiB) Viewed 11526 times
-
- Slide370.GIF (373.6 KiB) Viewed 11526 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
A few other various repairs mainly of the dog leg variety.
Both sides were in various states of repair but mainly solid so I just made the panels repair sections up myself rather than replace the whole innners or outers.
Both sides were in various states of repair but mainly solid so I just made the panels repair sections up myself rather than replace the whole innners or outers.
- Attachments
-
- Slide470.GIF (245.58 KiB) Viewed 11525 times
-
- Slide469.GIF (389.04 KiB) Viewed 11525 times
-
- Slide468.GIF (244.46 KiB) Viewed 11525 times
-
- Slide467.GIF (244.17 KiB) Viewed 11525 times
-
- Slide466.GIF (358.1 KiB) Viewed 11525 times
-
- Slide465.GIF (376.06 KiB) Viewed 11525 times
-
- Slide464.GIF (408.21 KiB) Viewed 11525 times
-
- Slide463.GIF (416.1 KiB) Viewed 11525 times
-
- Slide462.GIF (414.74 KiB) Viewed 11525 times
-
- Slide461.GIF (320.43 KiB) Viewed 11525 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Wolsburg West Front Safari install
- Attachments
-
- SAFARI INSTALL.JPG (119.12 KiB) Viewed 11525 times
-
- IMG_5606.JPG (12.38 KiB) Viewed 11525 times
-
- 9SAFARI INSTALL.JPG (105.78 KiB) Viewed 11525 times
-
- 8SAFARI INSTALL.JPG (134.83 KiB) Viewed 11525 times
-
- 7SAFARI INSTALL.JPG (144.56 KiB) Viewed 11525 times
-
- 6SAFARI INSTALL.JPG (172.29 KiB) Viewed 11525 times
-
- 5SAFARI INSTALL.JPG (191.34 KiB) Viewed 11525 times
-
- 4SAFARI INSTALL.JPG (175.07 KiB) Viewed 11525 times
-
- 3SAFARI INSTALL.JPG (159.32 KiB) Viewed 11525 times
-
- 2SAFARI INSTALL.JPG (123.62 KiB) Viewed 11525 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Rear Safari Install
- Attachments
-
- 5Rear Safari Install.JPG (87.42 KiB) Viewed 11524 times
-
- 4Rear Safari Install.JPG (151.42 KiB) Viewed 11524 times
-
- 3Rear Safari Install.JPG (75.56 KiB) Viewed 11524 times
-
- 2Rear Safari Install.JPG (62.75 KiB) Viewed 11524 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
A few pics on the rear window latch metalwork replacement and then the seat belt plate install throughout the bus.
The seat belt plates for the B Pillars fitted nicely through the semaphore holes, another plus for an early bus..
The seat belt plates for the B Pillars fitted nicely through the semaphore holes, another plus for an early bus..
- Attachments
-
- Slide428.GIF (253.2 KiB) Viewed 11524 times
-
- Slide427.GIF (188.53 KiB) Viewed 11524 times
-
- Slide426.GIF (199.36 KiB) Viewed 11524 times
-
- Slide425.GIF (194.92 KiB) Viewed 11524 times
-
- Slide424.GIF (210.65 KiB) Viewed 11524 times
-
- Slide423.GIF (398.41 KiB) Viewed 11524 times
-
- Slide422.GIF (217.86 KiB) Viewed 11524 times
-
- Slide420.GIF (211.03 KiB) Viewed 11524 times
-
- Slide418.GIF (413.87 KiB) Viewed 11524 times
-
- Slide417.GIF (392.88 KiB) Viewed 11524 times
- morts
- DSKer
- Posts: 2097
- Joined: Sun Oct 29, 2006 9:22 pm
- Location: McLaren Vale, South Australia
Re: 1956 Bus Project Post Completion
Super bus when you found it and now too...- great job!
No matter what happens they can't take you out in the street and shoot you......
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
This that moment, all that patina taken by sand and air...if i could undo it i would..
Also this is the moment when you started relying on others, it was at the sandblaster for over 6 months...until i nagged enough to finally get it back.
Also this is the moment when you started relying on others, it was at the sandblaster for over 6 months...until i nagged enough to finally get it back.
- Attachments
-
- Sandblasted.JPG (101.49 KiB) Viewed 11464 times
-
- 5Sandblasted.JPG (112.96 KiB) Viewed 11464 times
-
- 4Sandblasted.JPG (141 KiB) Viewed 11464 times
-
- 3Sandblasted.JPG (151.41 KiB) Viewed 11464 times
-
- 2Sandblasted.JPG (128.14 KiB) Viewed 11464 times
-
- 1Sandblasted.JPG (75 KiB) Viewed 11464 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Off to Martin Pomeroy for all the straightening and alignment, the memo was dead straight, skim coat bog only, and show quality paint.
This process was around a year, but i was happy to wait.
Martin is a master in this space, even though he hates painting cars..
I will flick up some pics of the paint job next.
This process was around a year, but i was happy to wait.
Martin is a master in this space, even though he hates painting cars..
I will flick up some pics of the paint job next.
- Attachments
-
- Painting.jpg (138.27 KiB) Viewed 11464 times
-
- 4Painting.jpg (108 KiB) Viewed 11464 times
-
- 3Painting.jpg (87.48 KiB) Viewed 11464 times
-
- 2Painting.jpg (54.84 KiB) Viewed 11464 times
-
- 1Painting.jpg (140.62 KiB) Viewed 11464 times
- Kombiiknut
- DSKer
- Posts: 289
- Joined: Thu Oct 06, 2022 7:35 pm
Re: 1956 Bus Project Post Completion
Just found these few pics in the archives of the pre-paint
- Attachments
-
- Lachy sent 61016 (6).jpg (62.91 KiB) Viewed 11290 times
-
- Lachy sent 61016 (4).jpg (59.31 KiB) Viewed 11290 times
-
- Lachy sent 61016 (14).jpg (65.33 KiB) Viewed 11290 times
-
- Lachy sent 61016 (13).jpg (65.07 KiB) Viewed 11290 times
-
- Lachy sent 61016 (12).jpg (73.33 KiB) Viewed 11290 times
-
- Lachy sent 61016 (11).jpg (68.73 KiB) Viewed 11290 times
-
- Lachy sent 61016 (10).jpg (71.86 KiB) Viewed 11290 times
-
- Lachy sent 61016 (9).jpg (68.03 KiB) Viewed 11290 times
-
- Lachy sent 61016 (8).jpg (77.81 KiB) Viewed 11290 times
-
- Lachy sent 61016 (7).jpg (72.49 KiB) Viewed 11290 times